Route 22 Back





March 2009:

New York State DOT reports that plans are in the works to widen Route 22 southbound from Doansburg Rd to the Route 312 traffic light by adding a full right lane leading to a turning lane for Route 312. The schedule is place the job out to bid in September 2009, award bid in December and commence work spring 2010. DOT is in negotiation with Kelly's Corner to decide where the entrance will be placed. There will no longer be an open parking lot.

Dot Region 8 schedule (March 2005)

Route 22 Regional Assessment Report (April 1, 2003):

  1. Titlepage.pdf
  2. TableOfContents.pdf
  3. Draft Exec Sum.pdf
  4. Draft Findings & Recs.pdf
  5. Attachment A.pdf
  6. Attachment B.pdf
  7. Attachment C.pdf
  8. Attachment D.pdf
  9. Attachment E.pdf

 

| Home | Join! | Contact | News | Back |

Copyright © 2015 CRSE | Original Design by taconicarts.com